You are currently using the Elevion Group Germany website.
Would you like to switch to our international website?

Yes, I want to see the international website.
Fontanacervo (TO)

Photovoltaic intervention for an agricultural company

Challenge

The intervention involved the rehabilitation of the roof and the replacement of the asbestos roofing with sandwich panels, the adaptation of the electrical system of the stables and the construction of the new lighting system with LED technology. 

Solution

The intervention made it possible to reduce electricity consumption by 25% with an emissions saving of 43t / year. The photovoltaic system guarantees an average coverage of electricity needs of 25% from renewable sources. The electrical system was connected to a photovoltaic system with a power of 129.96 kWp.

Location


Fontanacervo (TO)
Client

Società Agricola Fontana

Type of building

Photovoltaic

Realisation
We are here for you!
inewa

A. Volta Straße 13/A, 39100 Bolzano-Bozen

Phone: +39 0471 1957078

Mail: info(at)inewa.it

inewa

Explore our projects

Tramm and Lewitzrand
Tramm-Göthen
Read more