Challenge

Extension of the production plant with the production-warehouse section, including two lines for the production of dry snacks and the accompanying technical infrastructure.

Solution

The work included:

  • Preparation of construction and detailed designs for the respective disciplines and obtaining of the building permit
  • Delivery and installation of the gas-fired steam boiler with allowable pressure of 32 bar and capacity of 12.5 t/h
  • Provision of the steam system with a pressure of 28.5 bar, 9.5 bar, 3.0 bar and capacity of 26.5 t/h
  • Provision of the DN 800 chimney stack with a height of 21.5 m
  • Provision of electrical systems and the ICA equipment

Location


99-300 Kutno
Client

UMA Investments Sp. z o.o. Kutno, manufacturer of food articles

Realisation
05